
We undertook utility relocation works for the Woden Section 79 redevelopment in Canberra. The project involved excavation and relocation of underground utility services within a constrained urban environment, supporting major redevelopment works while maintaining safe construction practices and protecting existing infrastructure.

We delivered underground civil infrastructure works for a renewable energy development near Merriwa, NSW. The project included bulk trench excavation, installation of underground drainage and conduit systems, precast concrete pit installation, pipe laying, bedding, compaction and backfilling. Working within an active construction environment, the team maintained high standards of safety, quality and productivity while meeting strict engineering specifications.

We completed gas mains upgrade works for a major Westfield Shopping Centre, delivering new commercial gas infrastructure to support retail operations. The project involved installation of above-ground gas pipework, plant equipment, regulator assemblies, commissioning support and live-service changeovers while maintaining uninterrupted operation of the shopping centre.

We was engaged to deliver the construction of reinforced concrete culvert extensions and associated drainage infrastructure at Rye Park. The project was completed to improve stormwater capacity, protect existing road infrastructure, and enhance long-term drainage performance within the project corridor.

We delivered underground electrical infrastructure works in Gungahlin, constructing a new conduit network to support future power distribution. The project involved trench excavation, conduit installation, bedding, concrete encasement, service crossings, backfilling and full site reinstatement while maintaining safe operations adjacent to live roads and public areas.

We completed road repair and civil remediation works along Isaacs Ridge, undertaking excavation, slope stabilisation and road formation activities in a challenging bushland environment. The project required precise earthworks using specialist excavators while maintaining safe access and protecting the surrounding natural environment.

We successfully delivered critical gas pipeline installation works at Chester Hill, NSW. The project involved live utility construction, electrofusion welding, excavation, pipeline installation, tie-ins to existing infrastructure, and reinstatement. Our experienced crews safely completed the works while maintaining service continuity and complying with stringent safety, environmental and quality requirements.

We delivered road widening and pavement improvement works within the NSW National Parks network. The project included shoulder widening, edge strengthening and pavement construction to improve road safety, accessibility and long-term durability while working within environmentally sensitive areas.

We completed underground plumbing and civil infrastructure works for the Metro Canberra development. The project involved installation of underground drainage, sewer and stormwater services within a busy urban construction environment, ensuring coordination with other trades while maintaining safe access and quality outcomes.

We completed civil works associated with a trenchless bore crossing on the Monaro Highway. The project included excavation of launch and receival pits, installation of steel casing and service conduits, supporting earthworks, and reinstatement. The works were delivered in a live road corridor with a strong focus on safety, quality and protection of existing infrastructure.

We delivered comprehensive ground rehabilitation and utility reinstatement works following underground infrastructure construction. The project included excavation, installation of underground utility infrastructure, rehabilitation of disturbed ground, erosion and sediment control, surface stabilisation and restoration to meet client and environmental requirements.

We completed integrity excavation works on the Gundaroo Drive gas pipeline network to safely expose, inspect and assess existing underground assets. The project involved deep excavation, engineered shoring, confined excavation activities, pipe exposure, inspection support and reinstatement while maintaining a safe work environment in a busy urban corridor.

We undertook civil excavation and underground utility works as part of the Nowra Bridge Duplication project. The project involved rock excavation, trenching, installation of underground services, excavation in constrained urban environments, and supporting infrastructure works associated with one of the Shoalhaven region's major transport upgrades.

We delivered underground civil works for the Molonglo Zone Substation development in the ACT. The project involved excavation and installation of multiple underground electrical conduit banks, construction of service trenches, backfilling and compaction around conduits, and installation of precast service pits. The works supported critical power infrastructure for the growing Molonglo region while maintaining strict quality and safety standards.

We completed underground plumbing and civil infrastructure works for the Metro Canberra development. The project involved installation of underground drainage, sewer and stormwater services within a busy urban construction environment, ensuring coordination with other trades while maintaining safe access and quality outcomes.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.